African Oil and Gas Blog
Welcome to the AOJ BLOG.
Total Increases Production at OML 58 in Nigeria

Total Increases Production at OML 58 in Nigeria


Total announced that its subsidiary Total E&P Nigeria Limited (TEPNG), operator of the NNPC/TEPNG joint venture with a 40% interest, has launched the OML 58 upgrade project. Nigerian National Petroleum Corporation (NNPC) owns the remaining 60% interest of the joint venture. OML 58 is located onshore Nigeria (Rivers States), approximately 85 kilometers North West of Port Harcourt in the Niger Delta.


The OML 58 gas treatment plant has been on stream since December 1999. The OML 58 upgrade is designed to increase gas production capacity from 10.6 million cubic meters per day (370 mmscfd) at present to 15.6 million cubic meters per day (550 mmscfd), and also increase oil and condensate output by around 15,000 barrels per day bringing the total output to 140,000 barrels of oil equivalent per day...more...

2008-10-31 06:59:45 GMT
RSS