
ANGOLA ALGERIA CAMEROON CHAD. CONGO EGYPT.. EQUATORIAL GUINEA GABON LIBYA. NIGERIA SOUTH AFRICA SUDAN TUNISIA OTHERS
08-07-2007
Gallic Energy Ltd. announces that drilling of the Bhayra Rigo No.1 well on the Jorf permit commenced on July 30, 2007. The exploratory well will be drilled to approximately 2,500 metres in order to test a large Permian age reef structure which had been identified through the interpretation of older vintage seismic data. A new 166 km 2D seismic program, acquired at the beginning of 2007, confirmed the presence of this structure and of several other anomalies also interpreted as potential reef build-ups. The well is expected to take until the end of August to reach the final depth.
Gallic will pay 15% of drilling and completion costs to earn a 10% interest in the Bhayra Rigo No.1 well, with a further option to farm-in on drilling into other structures w