ABOUT US

AFRICAN OIL BLOG

INDUSTRY/TECHNOLOGY

CONTACT US

  STATISTICS

HOME

A.O.J  AD. RATES AND INFO.

Who's Who in Oil

CONFERENCES AND EVENTS CALENDAR

ANGOLA      ALGERIA      CAMEROON      CHAD.      CONGO      EGYPT      EQUATORIAL GUINEA      GABON      LIBYA.     NIGERIA      SOUTH AFRICA      SUDAN      TUNISIA      OTHERS 

 

 

 

 

 

 

Gulf Keystone Announces Gas Flow at RM-1 Well in Algeria

06-27-2008

Gulf Keystone Petroleum Ltd has announced that drilling of the RM-1 exploration well on the Hassi Ba Hamou Permit in Algeria has been completed and tested.

The RM-1 well, which was started on May 7, 2008, reached a total depth of 1,111 meters on a separate prospect some 50 kilometers to the southeast of the HBH gas field. Gas shows during drilling and logging results indicate a 61 meter gas column has been encountered in sands of Siegenian age. During a production test the well flowed gas at a stabilized flow rate of 10,266 cubic meters per hour (8.7 mmscf per day) through a 94/64-inch choke. 

With the success of RM-1, GKP has agreed to go into the second prospecting period of the HBH Permit with a work program obligation of 500 km2 of 3D seismic, 1 exploration well and 2 appraisal wells.

The drilling rig will now move to drill well FEG-1, the third and final exploration well to be drilled, and the fourth well in the current six well drilling campaign. This well is expected to spud within a month. No further announcement on the FEG-1 well is planned until the well has been completed.